Больше информации по резюме будет доступно после регистрации

Зарегистрироваться
Was online today at 10:09

Candidate

Male, 46 years, born on 19 November 1978

Considers offers

Moscow, metro station Prospekt Vernadskogo, willing to relocate (Germany, Kazakhstan, Qatar, Russia, Singapore), prepared for business trips

"Lead Piping/Mechanical Engineer", "Engineering Manager", "Principal Engineer", "Project Manager"

1 000 000  in hand

Specializations:
  • Design engineer

Employment: full time, part time, project work

Work schedule: full day, shift schedule, flexible schedule, remote working, rotation based work

Work experience 24 years 5 months

May 2023currently
2 years
Kellogg Brown & Root INT INC

UAE, www.kbr.com

Lead Piping & Layout engineer
Key responsibilities: • Responsible for the follow up and control of the Fujairah LNG Conractor's activities. • Responsible for the follow up and control of the Onshore Plant Conractor's activities and onshore Plant layout. • Reduce project costs by making decisions early in project life and eliminate late changes. • Challenge the engineering solution of the Contractor. • Participation in critical reviews (HAZOP, Project Technical Reviews, SIL, HAZIP, 3D Model review etc.) • To provide assistance/support to operations and commissioning/start up preparation teams. • To ensure Plant design: cost efficiency, consistency, optimization, operability, flexibility. • Support interface management and and resolution of issues between Contractors. • Ensure the design meets a high level standard and in accordance with ADNOC specifications. • To avoid LNG plant design Contractor stand-by/delays by prompt response to engineering queries, request to for waiver (if any) and unexpected technical issues.
January 2022May 2023
1 year 5 months

Moscow, www.novatek.ru

Oil and Gas... Show more

Head of Division - Field Engineering
Key responsibilities:  Plan, direct and supervise integration and hook-up works related activities of multi-disciplined team personnel in field engineering LNG facility to meet all target key objectives of integration with a focus on HSE, planning and quality.  Provide technical input to integration works associated with sub vendor scopes in NOVATEK MURMANSK PLANT  Implement the HSE Management policy, plan and procedures to do the work and to be aware of the content and intent of all quality procedures and ensure their implementation.  To manage all aspects of planning, preparation and execution for the Topsides Modules Integration and module Hookup to ensure mechanical completion of Sub systems / Systems and Completion of the Facility as defined by the scope of work and in line with the project planning priorities and agreed Milestones.  Delivery within cost and schedule of Integrated Topsides and a Topsides-to-GBS Facility with all activities up to Systems completions activities completed  Coordination of all Integrated Topsides and Topsides / GBS Facility construction work  Provides and coordinates Technical Support internal and external parties  Assisting in developing the Integration and Hookup portion of the schedule for the project  Managing and administering of the site contracts to achieve safety, quality, budget and schedule objectives  Managing interfaces on site including between contractors, and between Construction and Operations.  Assist handover to Commissioning and/or Operations
July 2017July 2021
4 years 1 month

Moscow, www.novatek.ru

Oil and Gas... Show more

Lead Piping Engineer
Key responsibilities: • Responsible for the follow up and control of the Arctic LNG-2 Plant Conractor's activities, for LNG Top side • Responsible for the follow up and control of the Onshore Plant Conractor's activities and onshore Plant layout. • Reduce project costs by making decisions early in project life and eliminate late changes. • Challenge the engineering solution of the Contractor. • Participation in critical reviews (HAZOP, Project Technical Reviews, SIL, HAZIP, 3D Model review etc.) • To provide assistance/support to operations and commissioning/start up preparation teams. • To ensure Plant design: cost efficiency, consistency, optimization, operability, flexibility. • Support interface management and and resolution of issues between Contractors. • Ensure the design meets a high level standard for LNG Top side and Onshore LNG facilities engineering. • To ensure that engineering design complies with international/Russian standards, S.O.R., contract documentation, schedule and budget. • To avoid LNG plant design Contractor stand-by/delays by prompt response to engineering queries, request to for waiver (if any) and unexpected technical issues.
March 2014July 2017
3 years 5 months
JV “Vietsovpetro”, R&D Institute, Vung Tau

Vietnam, www.vietsov.com.vn/Eng/Pages/Default.aspx

Oil and Gas... Show more

Piping/Mechanical Principal Specialist
Key Accountabilities & Achievements: • Reported directly to the Department and General Project Managers with accountability for overseeing and supporting projects, construction operations, installations, renovations and maintenance issues for all projects ensuring alignment with specifications and regulations. • Prepared and reviewed project documentation (FEED, DD) under mechanical department scope, supervision during construction. • Delivered full engineering support throughout construction start up and commissioning phases including researching and developing solutions to improve equipment packaging and piping. • Prepared technical requirements, specifications/data sheets for tendering and participated on the subcontractors evaluation. • Instrumental in modernising the existing wellhead jackets to maximise operational profits; being responsible for piping and mechanical project scope, FEED and detailed drawings, and 3D modelling and calculations. • Improvements for the typical design solutions for auxiliary systems and mechanical equipment in order to improve technical and economic capacity and reduce labor costs for the project. • Implemented onshore constructed diesel generators resulting in cost effective offshore installation processes. • Provided management cover during periods of absence ensuring business and project objectives were met. • Devised and implemented guidelines and standards for the cost effective modernisation of equipment packages, piping systems and mount/dismount super modules. • Played a pivotal role in improving retrofit foam extinguishing station dispensing compressed air system which resulted in annual savings of over $75k.
April 2012March 2014
2 years
EPC “Technics Oil & Gas Limited”, Singapore

Singapore, www.technicsgrp.com/

Industrial Equipment, Machine Tools and Components... Show more

Piping Design Engineer (Team lead position)
Key Accountabilities & Achievements: • Led, trained and coordinated multinational team of CAD designers throughout the SKID equipment projects lifecycle. • Project management, provided project schedule and man hours, drew up a list of project documentation, project documentation (FEED, DD) under piping/mechanical scope, provided interdisciplinary checking and coordination, prepared technical requirements, documentation for bidding. • Managed, initiated and kept actual 3D models for the offshore process projects, controlled all inputs and outputs and checked clashes between disciplines, tracked the project progress. • Supported the procurement team, Project Manager and construction team to facilitate delivery of projects. • Prepared FEED piping project specifications and calculations for wall thickness and stress, and produced offshore/onshore SKID layout design and 3D modelling. • Worked in collaboration with vendors, overseas and local stakeholders and project teams to ensure appropriate compliance documents and project specifications were in place, • Set up the piping department in line with agreed scope of work and services. • Accountable for supporting layout and stress analysis calculations on the topside modules/SKIDs, and ensuring engineering activities met quality, client and project guidelines. • Successfully completed whole project cycle for actuated ball valves (SDV and BDV) from calculations and procurement to manufacturing and FAT at total cost $900K
March 2001April 2012
11 years 2 months
CDB "Corall"

Russia, cdbcorall.ru/en/

Construction, Real Estate, Architecture... Show more

Senior Piping/Mechanical Design Engineer
Key Accountabilities & Achievements: • Lead of the 3D modeling group up to 25 pax • Initiate and compile estimates for engineering labor hours and schedule • Ensure interaction with other engineering disciplines • Offshore ice-resistant drilling units layout design and 3D modelling • Stress analysis calculations • Provide technical bid evaluation • Concept, FEED & DD stages • Participate in the HAZID / HAZOP study • Coaching, teaching, and supervision of assigned personnel • Provide vendor technical bid evaluation • Supervision offshore fixed platforms during construction.
July 2000March 2001
9 months
EPC “Chernomorets”, Sevastopol

Russia

Heavy Engineering... Show more

Piping/Mechanical Design Engineer
Key responsibilities: • FEED study, plot plan preparation, equipment layout, piping layout, detail drawings, piping isometrics, operating manuals, supervising during construction.

Skills

Skill proficiency levels
Piping
Mechanical
Engineering
Design
EPC project
RDI
engineering manager
3D modeling
Plot plan
Layout
supervision
coordination
Planning

Driving experience

Own car

Driver's license category B

About me

University graduate Mechanical Engineer (Piping) having 20+ years of international experience with major Oil & Gas projects around the world. Specializing in control Contractor’s activities such as challenging the engineering solutions, cost efficiency, team leading, project management, quality assurance, piping engineering & layout design, design reviews, supervision during installation & construction. Experienced with the world's largest LNG project as Lead Piping Engineer from Client’s side, went through all project phases from transition period preFEED - FEED to EPC, including involvement into interface management, integration, hook-up activities, pre- commissioning and commissioning. Have been involved in many aspects of the Contractual relationships between Client and one of the world’s major EPC Company Technip ENERGIES. Having comprehensive knowledge how to challenge Contractor and Subcontractors solutions to achieve optimized CAPEX without jeopardize OPEX and project schedule. Able to bring expertise, what points shall be focused to minimize or even avoid Change Orders to the lump sum Contract, how to challenge Contractor’s conservative approach in Piping & Layout perspective to decrease CAPEX without compromising quality. Testimonials from senior industry figures upon request.

Portfolio

Higher education

2019
Heriot-Watt University, Edinburgh
MBA, Master's Degree of Business Administration with Specialism in Oil and Gas Management
2000
Marine power generating systems and equipment, Mechanical engineer / specialist
1999
Marine power generating systems and equipment, Mechanical engineer / bachelor

Languages

RussianNative


EnglishC2 — Proficiency


Professional development, courses

2015
Smart marine 3D
Tru Tech, 3D modelling software

Tests, examinations

2016
IELTS
Vietnam British Council, Academic English

Citizenship, travel time to work

Citizenship: Russia

Permission to work: Russia

Desired travel time to work: Doesn't matter