Больше информации по резюме будет доступно после регистрации

Зарегистрироваться

Candidate

Male, 42 years, born on 16 April 1982

Turkey, I want to relocate (Almaty, Astana, Bahrain, Qatar, UAE, Saint Petersburg), prepared for business trips

Project manager

8 000 $ in hand

Specializations:
  • Project manager

Employment: full time, project work

Work schedule: full day

Work experience 9 years 6 months

August 2015August 2016
1 year 1 month
Mohib Holdings

www.mholdings.com

MEP Manager
• Responsible for electro-mechanical works, design clarifications, selection and evaluation of materials / offers, equipment selections, issuing of purchase orders for equipment, materials and hand tools. Preparation of site works, manpower, and all necessities to initiate site works. • Interviews with local electrical and mechanical engineers, manpower study for the site works. • Meeting the Designer for Shop Drawing Requirements prior to installation works take place. • Application to local authority for main powers grid, incoming waters supply and sewage system connections to municipality sub-systems. Well coring as a backup of incoming water supply. • Review and evaluation of Design Proposals for upcoming additional projects, BoQ generated by Revit, shop drawings, specifications. • Requesting for quotations for boilers, chillers, VRVs, CCTV, fire alarm & security systems, STP. • Subcontracting evaluation, studies for having own duct fabrication facility. • Cut-out / provisions preparation and verification of provisions at site. • Coordination of all MEP Systems in terms of site installation and materials delivery to site. • Preparation of RFI’s for the coordination problems prior to site installation takes place.
June 2014August 2015
1 year 3 months
Akfa Contracting

www.akfa.com.tr

Mechanical Technical Office Manager
(120,000 m2 passenger terminal and various auxiliary facilities, a 90,000 m2 and 3,000 vehicle capacity multi-story car park, fire brigade building, operation center, power station, apron, and infrastructure work that will join terminal-5 to the existing terminals.) • Technical and financial evaluation of offers of equipment (Chillers, CT, Boilers, AHUs, FCUs, pumps and fire pumps etc, • Responsible for material submittal for equipment for approval to consultant. • Issuance of Purchase orders to procurement dept. (all mechanical materials and equipment) • Preparation of Installation Method Statements, assisting the preparation of shop drawings. Coordination of mechanical systems with BHS (Baggage Handling System) & electrical systems. • Attending FAT of Chillers and Fire Pumps for Performance Test Witnessing. • Preparation of completion program of mechanical materials in terms of material approval, purchase order, delivery, installation and commissioning periods. • Coordination of meetings with client/consultant/main contractor engineers to sort out design issues and material approvals. • Coordination of site works with design team; coordination of draftsmen for the completion of shop drawings and coordination of mechanical systems with other disciplines. • Representing mechanical department in the daily site coordination meetings for site progress and attending weekly meetings for design coordination.
February 2013April 2014
1 year 3 months
Ekin Proje A.S

www.ekinproje.com

Testing & Commissioning Chief Engineer
• Preparation of Commissioning Plan, Training Plan, Commissioning Method Statements for mechanical systems as ventilation, heating & cooling systems, waste water and domestic water systems, flushing, and air & water balancing. • Responsible for post installations of equipments, preparing the systems for inspection, pre-commissioning and commissioning. Reporting the system defects and/or faults to construction and design departments. Coordination of subcontractors responsible for ducting & piping & air balancing. System equipments: AHU (Handling Units), FCU’s and PACU’s, booster and circulation pumps, unit heaters, air curtains, convector (trench heaters) etc... • Responsible for completing the missing installations which are necessary for full system commissioning and submission to client. • Start-up of mechanical equipments along with or without supplier’ service supervisors. Preparing the systems for inspections that will take place with the consultant. • Reporting / updating the progress logs and re-scheduling the commissioning program in case of delays in commissioning activities. • Responsible for the preparation of Air Balancing Passports
June 2012December 2012
7 months
Kiklop Design & Engineering
Testing & Commissioning and Handover Manager (Mechanical)
Responsible for the testing & commissioning and handing over of mechanical systems. Preparation of testing & commissioning method statements and pre-comm. and comm. checklists for mechanical equipments. Preparation of mechanical handover booklets for buildings. Attending pre-commissioning activities with the client representatives. Preparing the method statements for the pressure testing and flushing / cleaning of water infrastructure works (Potable Water Network – Heating & Cooling Networks – Sewage & Stormwater Networks)
September 2011June 2012
10 months
ENPRODE Engineering & Consulting Co.

www.enprode.com.tr

Mechanical Works Chief Engineer
Responsible for the installation of all mechanical works in the respective project such as Siemens Gas Turbine (SGT-800B), Aalborg Boilers, Air Cooled Condenser (ACC), Gas Fuel Station (RMS), Demineralized Water Building, Fin Fan Cooler (FFC) & Simple Cycle Piping. Coordination of the sub-contractors in terms of manpower, cranes, working hours etc… Provision of the necessary drawings and information to sub-contractors, evaluation of the payment for the completed jobs.
February 2008June 2011
3 years 5 months
Ekin Proje

www.ekinproje.com.tr

Technical Procurement Engineer & T&C Site Engineer
Testing Commissioning & Handing Over Site Engineer (Complete System) (07/2010 – 06/2011) • Responsible for proportional air balancing and final commissioning of Air Handling Units, FCU’s and ACU’s. Starting up of mechanical equipment and handing over to client • Responsible for completing the missing installations which are necessary for full system commissioning and submission to client. Technical Procurement Engineer / MEP Materials (02/2008 – 07/2010) • Responsible for procuring below-listed materials of mechanical works in compliance with project specifications, epic documents and preferred vendor list. • Technical and financial evaluation of the below listed materials with details. • Analyzing Material Specifications and EPIC documents in light of Project changes or amendments and suggest or request updates or corrections in Specifications. • Submission of material documents and samples to Consultant for approval, issuing purchase orders for approved materials and following up of materials until delivery and installation. • Handled & Completed Project Materials:  Insulation for pipes and ducts & acoustical insulation (complete with fasteners, tapes, pins, adhesives, cover/lagging clothes, & protective lagging adhesives)  Fire Pump Sets (2+1 Main & Jockey) & Fire Hose Reel Cabinets & FM-200 Fire Suppression System  Sanitary Wares (Showers, Wash Hand Basins, WC Etc...), Plate Heat Exchanger  Miscellaneous Valves and MEP Materials (Trap Primer, Water Hammer Arrestor, Automatic Air Vent, Thermostatic Mixing Valve etc…) & Balancing Valves  Paint for Fire and HVAC System Piping, Vibration Isolator, Hanger & Supports,  GI Plain & Perforated Steel Sheet/Coil & Stucco Embossed Al. Coil, Carbon & SS 304 Sheet  Spiral Ducts, Dampers, Grilles & Diffusers, Flexible Pipe & Duct Connectors, Flexible Ducts
October 2006December 2007
1 year 3 months
Gama A.S

www.gama.com.tr

Site Engineer
* Responsible for organizing and coordinating teams of Steel Structure & Scaffolding, following up project materials until delivery to site, meeting site consumable requirements, local purchase orders, recording and issuing technical queries (TQ) & extra works. * Installation of steel structure of 3 units of 667 MW Boilers, Fans (GR, FD, ID), and pipe racks etc...

Skills

Skill proficiency levels
AutoCAD
Autodesk Revit
SolidWorks
MS Office
Team management
Analytical skills

About me

Things i am fond of doing: Basketball, Football, Volleyball, Table Tennis, Swimming, Fitness, Movies & Series etc…

Higher education (bachelor)

2006
University of Gaziantep
Mechanical Engineering, Bachelor of Science
2000
Fitnat Nuri Tekerekoglu Anatolian High School
Math-Science, Higher School Certificate

Languages

TurkishNative


EnglishC2 — Proficiency


GermanA1 — Basic


RussianA1 — Basic


Citizenship, travel time to work

Citizenship: Turkey

Permission to work: Russia, Turkey

Desired travel time to work: Doesn't matter